Background Image

JEA Reclaimed Water System Extension for Design-Build Services for CR 210 Widening

St. Johns County, Florida

Designing Reclaimed Water Main Extension to Support Regional Growth and JEA System Integration.

JEA Reclaimed Water System Extension

The primary method of installation was open cut construction.

A trenchless crossing of Trout Creek was required by horizontal directional drilling (HDD) of 1,150 LF of 30-inch HDPE.

JEA Reclaimed Water System Extension for Design-Build Services for CR 210 Widening Image
JEA Reclaimed Water System Extension for Design-Build Services for CR 210 Widening Image
Website Design and Development by 63 Visual Design Studio in Jacksonville Beach, Florida.