Stormwater Master Plan (East of Battery Creek)
Port Royal, South Carolina
Improving Resilience: 4Waters Identifies Drainage Solutions for Port Royal
Stormwater Master Plan
To identify the deficiencies in the stormwater system an evaluation was completed to assess the major conveyance system for different design storms. This was completed by utilizing a stormwater model to evaluate stormwater runoff and the efficiency of the hydraulic routing through the stormwater drainage
system.
The SWMP included development of a Stormwater GIS Database inventory and an implementation plan for identified deficiencies and proposed recommendations identified during the master planning process. This included a capital improvement plan with associated cost estimates.









