Background Image

Lake Apopka North Shore Interconnect Pump Station

St. Johns River Water Management District (SJRWMD), Florida

Supporting Lake Apopka North Shore Restoration and Water Quality Improvements

Lake Apopka North Shore Interconnect Pump Station

4Waters designed a duplex pump station with 75 Hp axial flow pumps, each capable of pumping 25 cfs (11,220 gpm) constant flow through the 30-inch diameter discharge piping.

Additional improvements included two new 60-inch and one 48 inch corrugated aluminum culverts with motor operating gates, three level stilling wells to monitor and control water levels, rip-rap stabilization on all embankments, overhead power to the pump station, and an electrical control station for the pumps and gravity control structure gates. In addition, 4Waters designed a permanent access earthen berm across Lake Level Canal

Lake Apopka North Shore Interconnect Pump Station Image
Lake Apopka North Shore Interconnect Pump Station Image
Website Design and Development by 63 Visual Design Studio in Jacksonville Beach, Florida.