JEA Reclaimed Water System Extension for Design-Build Services for CR 210 Widening
St. Johns County, Florida
Designing Reclaimed Water Main Extension to Support Regional Growth and JEA System Integration.
JEA Reclaimed Water System Extension
The primary method of installation was open cut construction.
A trenchless crossing of Trout Creek was required by horizontal directional drilling (HDD) of 1,150 LF of 30-inch HDPE.









